2017 New Style IMPAC Ring for Manila Factory
2017 New Style IMPAC Ring for Manila Factory Detail:
IMPAC RING is our new developed tower packing replacing Pall ring and other random tower packings. Compared with pall ring, IMPAC Ring has better compare surface area, and also can be working longer.
Material: Carbon Steel, SS304, SS304L, SS316, SS316L
Technical Data Sheet
Product detail pictures:

Related Product Guide:
Comparison of O-Ring Materials
O-Ring Sizes for Industrial Applications
2017 New Style IMPAC Ring for Manila Factory, The product will supply to all over the world, such as: , , ,
semi-automatic tube filling and sealing machine,filler and sealer for tubes,أنبوب ملء وختم الآلة
Any questions,feel free to contact me.
Email:htpmachinery@gmail.com
Skype:zhang.tracy6
More information:https://twitter.com/htpmachinery
Chick here to subscribe us
https://www.youtube.com/channel/UCo4XjYB_mRONyQKah8jbjVw
Specifications
Semi-auto tube filling sealing machine 1.Used for tube package 2.Especially for toothpaste pruducts 3.For tube fill seal
Specification
1.Main machine frame with stainless steel covers
2.AC inverter for main drive for step-less speed variation-
3.Automatic tube hopper with pneumatic system of tube insertion into rotary index table
4.Rotary index table for transferring tubes to filling, closing stations and other sections
5.Tube orientation controlled by photocell for accurate positioning of tubes
6.50 litres capacity stainless steel hopper
7.Stainless steel volumetric dozing syringe and Teflon piston seals for accurate dosage with step-less adjustment of volume
8.Tube lifting at filling station — so that filling nozzle gets inserted inside tube during filling
9.Tail cutting by ‘suck back’ method to prevent dripping of product after filling
10. Hot air tool for plastic / laminated tubes (Leister make heater)
11.PID temperature controller for accurate control of hot air temperature
12.Air supply to air heater through independent blower
13.Batch code embossing facility within sealing jaws (by using negatively etched character type fount)
14. Trimming of plastic / lami tubes at the top end
Automatic tube ejection
Preset counter
No−Tube−No−Fill system
Control sensor for non ejected tubes
Low air pressure switch
Emergency stop
Fixed position machine stop
Interflow successfully completed the technically demanding Terry’s Creek Sewer Submain rehabilitation in October 2015. The project included the rehabilitation of 3.2 kilometers of DN750 sewer main in a remote bushland location within the Northern Suburbs of Sydney. This video showcases the challenging nature of this job, as well as the obstacles that were overcome to deliver the project.







