Short Lead Time for PTFE Braided Gland Packing for Egypt Factory

Short Description:

Braided with 100% expanded PTFE, soft character, super fiber strength, ideal abrasion resistant material. Special porous structure of the fiber can better absorb and reserve lubrication and heat conductive agent useful for the sealing of packing to assure of consistency of lubrication and heat conductive agent, great reduction of possibility of efficacy loss. Much better meets demands of rigid using conditions. With the exception of very few chemicals, resists almost medium. Technical Data Sh...


Product Detail

Product Tags

Related Video

Feedback (2)

, , ,
Short Lead Time for PTFE Braided Gland Packing for Egypt Factory Detail:

Braided with 100% expanded PTFE, soft character, super fiber strength, ideal abrasion resistant material.

Special porous structure of the fiber can better absorb and reserve lubrication and heat conductive agent useful for the sealing of packing to assure of consistency of lubrication and heat conductive agent, great reduction of possibility of efficacy loss. Much better meets demands of rigid using conditions.

With the exception of very few chemicals, resists almost medium.

Technical Data Sheet

 

Rotating

Reciprocating

Valves

Pressure

2Mpa

15Mpa

20Mpa

Shaft Speed

10m/s rotary

Temperature

-200℃~+280℃

PH Range

0~14

 Application Area

Rotary and reciprocating plant in the food processing, pharmaceutical, special chemicals, and pulp and paper sectors.

It is particularly recommended for sugar and chocolate processing, and fine paper production.


Product detail pictures:

Short Lead Time for
 PTFE Braided Gland Packing for Egypt Factory detail pictures


Related Product Guide:
Comparison of O-Ring Materials
Useful Tips For Installing The Teflon Envelope Gasket

Short Lead Time for PTFE Braided Gland Packing for Egypt Factory, The product will supply to all over the world, such as: , , ,


  • PARTS LIST BELOW. Got this idea from u-tuber Approtechie. He has a lot of good ideas. Use schedule 40 white PVC pipe. I don’t have back up power here so this is my way of accessing my most convenient source of clean water if the power should go out for a long period of time. I used teflon tape on any threaded joints(probably not necessary). This cost about $70 to put together. It looks like from comments that pumping from water levels deeper than 50ft is a very heavy lift. So maybe not worth going deeper. Maybe Approtechie has an opinion on that considering he designed these himself. My only experience is with my own well which has a pretty shallow static water depth of about 11ft., pretty easy at that depth.
    Parts List

    Outer Pipe Assembly-
    -One 11/4″ plastic foot valve(Lowes has them)
    -One 11/4″ adapter(slip x thread)
    -As much 11/4″ PVC pipe and couplings as needed
    -One 11/4″ x 1″ Tee(slip)- This is at the top.
    -One 11/4″ x 1″ Bushing(slip)- This goes into the tee.
    -One 1″ x 1/2″ Bushing(slip) Trim the inside of this one.- This goes into the previous bushing.

    Inner Pipe Assembly-
    One 3/4″ Plastic foot valve
    -One 3/4″ Adapter(slip x thread) Trim the nubs off of this one.
    -One 3″ length of 3/4″ pipe. Sand one end to fit into 1″ piston pipe.- Connects the piston to the adapter.
    -About a 3ft. length of 1″ pipe- this will be the piston.
    -One more 1″ x 1/2″ Bushing(slip). Don’t trim this one. Glue it to the top of the piston and glue the 1/2″ ram pipe to it.
    -As much 1/2″ pipe and couplings as needed(drill 1/4″ holes straight through this pipe just above the piston).
    -One 1/2″Tee(slip) + two short lengths of 1/2″ pipe with two 1/2″caps(slip) complete the handle at the top of the 1/2″ ram pipe.

    THAT’S IT….But for this design to work ,as seen, you MUST SEAL UP THE 1/2″ pipe so that water doesn’t go up it too much higher than the 1/4″ transfer holes. Certainly not all the way to the top(check out the Further Pump Explanation vid in this box).
    I capped the handle off completely in order to trap air inside the upper portion of the 1/2″ pipe so that I don’t waste energy lifting a lot of trapped water up and down. But mostly because it forces the water out the 11/4Tee which is where I want it to go. Otherwise it could come out the handle as well which I do not want. You could, instead of capping the handle off, block up the 1/2″ pipe just above the transfer holes by gluing a nickel into one of the 1/2″ couplings. This would accomplish the same thing and make the caps on the Tee unnecessary. It would also allow you to install the 1/2″ pipe one piece at a time, if you wanted to, without it filling up with water. I was a little worried that the trapped air in my pump would make the inner pipe too buoyant and rise up on its own so I drilled a hole in it about midway down to add a little weight. My well is pretty clean so I didn’t put any kind of filter at the bottom. Some wells might need a finer screen than the one that comes with the foot valve( I think I’ve heard of people using sack cloth for this but not sure). For larger depths it might help to make the piston longer, maybe 5ft.
    Youtuber sameggers1 did a great video of his deep well version

    https://youtu.be/pXBRVi0eMvA

    Here is Approtechie’s video, a must see.

    https://youtu.be/OdVw5R4JBfc

    My vid.-Further Pump Explanation https://youtu.be/XjGUdxSgosQ


    5 Stars By from -

    5 Stars By from -

    Related Products